• 🏆 Texturing Contest #33 is OPEN! Contestants must re-texture a SD unit model found in-game (Warcraft 3 Classic), recreating the unit into a peaceful NPC version. 🔗Click here to enter!
  • 🏆 Hive's 6th HD Modeling Contest: Mechanical is now open! Design and model a mechanical creature, mechanized animal, a futuristic robotic being, or anything else your imagination can tinker with! 📅 Submissions close on June 30, 2024. Don't miss this opportunity to let your creativity shine! Enter now and show us your mechanical masterpiece! 🔗 Click here to enter!

Goblin Zeppelin Loading More Units

Status
Not open for further replies.
Level 3
Joined
May 10, 2017
Messages
17
Hello everyone,

Is there any way to edit the "Load (Goblin Zeppelin)" spell, to make it carry more units?
 
Level 13
Joined
Mar 24, 2013
Messages
1,105
In order to change the capacity, you need to change Cargo Hold (Zeppelin), however, I just tested it, and anything over 11 crashes the game when something is attempted to be loaded. If you add 10 and then try to add 1 more with the capacity set to 11, it then crashes, although I also had it malfunction where it would not unload the 1st unit out of the zeppelin when the capacity was 11. It appears the cap for the hard-coded Cargo Load is 10.

You could trigger a Cargo Hold with unlimited capacity, however if you wanted to load and unload a specific unit, it would likely be cumbersome, or not easily possible.
 
Status
Not open for further replies.
Top